Concrete Boom Pump Training

COURSE CONTENT

  • Describe the nature of the sector of industry and their role and responsibilities as a plant operator.
  • Name and explain the purpose of principle components, the basic construction, controls and terminology.
  • Confirm with Manufacturer’s requirements as per the operators handbook, other types of information source and the relevant regulations and legislation.
  • Undertake all pre-use checks.
  • Confirm the position and configure the plant machinery for pumping duties.
  • Deploy the outriggers to specification (where applicable).
  • Arrange, anchor and secure all pipes and lines.
  • Confirm a given mix is able to be pumped.
  • Arrange and comply with communication procedures.
  • Direct the loading / mixer vehicle to position.
  • Explain action required for hazards, underground and overhead services.
  • Pump and control materials accurately to the desired pour location.
  • Explain how blockages occur and solution methods.
  • Maintain safe working situations.
  • Carry out shut down and securing procedures for the plant equipment.
  • Complete end-of-use cleaning procedures.

Request Free Consultation